Jaipur Metro Phase 2 Approved: What the 41 km Corridor Means for You

Jaipur Metro Phase 2 Approved: What the 41 km Corridor Means for You
Jaipur just got a massive upgrade on paper, and it's the kind that could change how the entire city moves.
On April 8, 2026, the Union Cabinet chaired by PM Narendra Modi gave the green light to Jaipur Metro Phase 2, a 41 km North-South corridor stretching from Prahladpura to Todi Mod, with 36 stations and a total project cost of ₹13,037.66 crore.
If you've ever been stuck in traffic on Tonk Road at 9 AM, or watched an auto meter tick past ₹200 just to get to the airport, you already understand why this matters. Jaipur Metro Phase 2 is not just a metro expansion. It's a structural shift in how the Pink City will breathe, move, and grow.
What Is Jaipur Metro Phase 2 and Why Does It Matter
Right now, Jaipur's metro system runs on a single East-West line. Phase 1 operates along the East-West corridor from Mansarovar to Badi Chaupar, covering 11.64 km with 11 stations, connecting residential and commercial areas with the Heritage Walled City.
That's a solid line, but it only scratches the surface of the city's needs. Jaipur has grown enormously northward and southward. Neighborhoods like Vidhyadhar Nagar and areas like Sitapura Industrial Zone sit at opposite ends of the city with no metro link between them.
Phase 2 fixes that. The new corridor will complement the Phase 1 network by adding a North-South axis, creating a more comprehensive, citywide transit system.
Think of it as adding a vertical spine to a skeleton that only had a horizontal rib.
The Route at a Glance
Prahladpura to Todi Mod: 36 Stations Across 41 km
The new line runs north to south, threading through some of Jaipur's busiest and most important areas. Key stops along the corridor include Sitapura Industrial Area, VKIA (Vishwakarma Industrial Area), Jaipur Airport, Tonk Road, SMS Hospital and Stadium, Ambabari, and Vidhyadhar Nagar.
Here's a quick look at the major zones this corridor will serve:
- North Jaipur: Prahladpura, Ambabari, Vidhyadhar Nagar — dense residential neighborhoods with limited current transit options
- Central Jaipur: SMS Hospital, SMS Stadium, Tonk Road — one of the city's highest-traffic daily zones
- Airport Zone: Direct metro access to Jaipur International Airport, including underground stations in this stretch
- South Jaipur: Sitapura Industrial Area, VKIA, Todi Mod — home to thousands of workers commuting daily
Underground Stations at the Airport
This is a big deal. The corridor includes underground stations in the airport area and will integrate with the operational Phase 1 through planned interchanges and feeder systems, creating a unified and continuous metro network across the city.
For travelers flying in and out of Jaipur, this means no more haggling over cab fares or navigating the airport road chaos. A clean, direct metro ride from the city to the terminal.
How Phase 2 Connects with Phase 1
The two lines won't just run in parallel. They'll connect. Interchange stations are planned where the North-South corridor meets the existing East-West line. This means you'll be able to travel from Mansarovar in the west, switch lines midway, and head down to Sitapura in the south — all on one metro network.
This kind of grid connectivity is what separates a functional metro city from a city that just has metro tracks. Jaipur is building toward the former.
Jaipur Metro Phase 2: Key Numbers
Here's a quick reference for everything confirmed so far:
Detail Info Total Length41 km Number of Stations36RoutePrahladpura to Todi Mod Project Cost₹13,037.66 crore Target Completion September 2031 Implementing Body RMRCL (50:50 JV, Centre + Rajasthan)Current Phase 1 Ridership~60,000 passengers/day
With the commissioning of Phase 2, the metro network is expected to witness a manifold increase in ridership, substantially enhancing the share of public transport in Jaipur and reducing dependence on private vehicles.
What This Means for Daily Commuters and Tourists
For Jaipur Residents
If you live in Vidhyadhar Nagar, Ambabari, or anywhere north of the city center, you've long been underserved by public transport. The Phase 2 metro map changes that entirely. A direct line to SMS Hospital, the central business district, and even the industrial south is now on the horizon.
For workers commuting to Sitapura or VKIA daily, the difference will be even more dramatic. Currently, that commute often means two auto rides, long waits, or expensive cab fares. A metro line cuts that down to a single, predictable journey.
For Tourists Visiting the Pink City
Jaipur sees millions of visitors every year. The existing Phase 1 metro already connects you to areas near the Heritage Walled City. Phase 2 expands that story. Here's what tourists can look forward to:
- Direct metro from the airport into the city, no cab required
- Easy access to SMS Museum, Jawahar Circle, and areas along Tonk Road
- Better connectivity between hotels in north Jaipur and attractions citywide
- Affordable metro fares instead of tourist-priced cabs
For Workers in Industrial Zones
The corridor will connect key industrial and residential areas from Sitapura to VKIA
, two of Jaipur's largest employment clusters. For the thousands who commute there daily, this is life-changing convenience.
Who Is Building Phase 2
The project will be implemented by Rajasthan Metro Rail Corporation Limited (RMRCL), a 50:50 joint venture between the Union government and the Rajasthan government.
Funding comes through a mix of central and state equity, subordinate debt, and multilateral financing — structured in line with the Metro Rail Policy 2017. The project has also passed economic viability checks, with an Economic Internal Rate of Return exceeding the 14% threshold, indicating strong socio-economic viability.
When Will Jaipur Metro Phase 2 Be Ready
Aligned with Rajasthan's Transit-Oriented Development Policy-2025 and national sustainable transport goals, the project is targeted for completion by September 2031.
That's five years away. Construction will likely begin in phases, with different sections of the 41 km corridor progressing at different speeds. The airport zone, which requires underground tunneling, will be one of the more technically complex stretches.
Watch this space. As timings, station designs, and construction updates emerge, we'll cover every detail right here.
FAQs About Jaipur Metro Phase 2
What is Jaipur Metro Phase 2?
It's a newly approved 41 km North-South metro corridor from Prahladpura to Todi Mod, with 36 stations. It will run alongside the existing Phase 1 East-West line and connect major zones including the airport, SMS Hospital, and industrial areas.
When will Jaipur Metro Phase 2 be operational?
The target completion date is September 2031. Construction is yet to begin, and updates will be shared as work progresses.
Will Phase 2 connect to Jaipur Airport?
Yes. The new corridor directly serves Jaipur International Airport, with underground stations planned in the airport zone for smoother access.
How does Phase 2 connect with the current Phase 1 metro?
Interchange stations are planned where the two corridors intersect, allowing passengers to switch seamlessly between the East-West and North-South lines.
What is the cost of Jaipur Metro Phase 2?
The total approved project cost is ₹13,037.66 crore, funded jointly by the central and Rajasthan state governments along with multilateral financing.
How many people currently use Jaipur Metro?
Phase 1 currently records around 60,000 passengers per day. Phase 2 is expected to multiply that figure significantly once operational.
The Road Ahead for Jaipur's Metro Network
Jaipur has always been a city that punches above its weight — in heritage, in tourism, and now in urban infrastructure. The Phase 2 approval is the single biggest step forward for public transport in Rajasthan's capital since Phase 1 launched over a decade ago.
A 41 km corridor. 36 stations. Direct airport connectivity. Industrial zones linked to residential neighborhoods. And a metro map that finally starts to match the scale of the city.
The Pink City is going places. And now, more of us can get there without a cab.
Stay updated with every Jaipur Metro Phase 2 development, route map, fare structure, and station guide right here at jaipurmetro.com. Bookmark this page and check back for the latest metro news, travel tips, and commuter guides.
Have questions about current Jaipur Metro routes, timings, or fares? Explore our guides or reach out to us directly. We cover everything metro in the Pink City.

